top of page

MassPort Logan Airport Terminal B-C Roadways Projects

Project Value Range: $300,000 - $400,000


Select Paint & Finishes was contracted directly by DW White Construction to perform the field painting of the Terminal B-C viaduct connector bridge structure. Select Paint crews installed an epoxy and urethane coating to all field connections, as well as a final topcoat on all exterior girders.


bottom of page