top of page

Massachusetts General Hospital Cooling Tower Frame, Boston, MA

Project Value Range: $275,000 - $325,000


Select Paint & Finishes was contracted directly by G. Greene Construction to perform the deleading and field painting of the structural steel framing supporting the rooftop cooling units. Select Paint crews installed a containment, deleaded the steel and applied a zinc, as well as two coats of high solids epoxy. All surface preparation and coating application was viewed and accepted by an independent qualified coating inspector.


bottom of page