Gillette Stadium Renovation Project, Foxborough, MA

  • Writer: Ryan Dogil
    Ryan Dogil
  • Apr 5, 2023
  • 1 min read

Project Value Range: $150,000 - $200,000


Select Paint & Finishes was contracted by Suffolk Construction Co. to perform the abrasive blasting of the structural steel columns at their North End Zone Project. Select Paint crews performed abrasive blasting to remove the existing three-coat paint system to allow the Iron Workers to weld additional steel reinforcements to strengthen the columns.


Comments


A National Premier full service Commercial & Industrial Painting Contractor

Main Headquarters

40 Lowell Road

Salem, NH 03079

(603) 386-0391

Boston Office

11 Elkins Street

Boston, MA 02127

(617) 882-7001

Milford Office

69 Eastern Steel Road

Milford, CT 06460

(475) 294-2877

Portland Office

185 Warren Ave
Westbrook, ME 04092
(207) 209-4091

Other Location

11C Industrial Way,

Salem, NH 03079

(603) 386-0391

Contact Us

Email: info@selectpaint.com

Phone: (603) 386-0384

Fax: (603) 458-7389

Follow Us

  • Facebook
  • Instagram
  • LinkedIn
Select Paint Logo - White Outline.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Paint is proud to be part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2025 by Select Paint

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page