Project Value Range: $850,000 - $950,000
Select Paint & Finishes was contracted directly by McCourt Construction to perform the abrasive blasting and field painting of the structural steel framing supporting the concrete girders and deck panels. Select Paint crews installed multiple containments, performed a SP-10 abrasive blast, and applied a zinc/ epoxy/urethane coating system . All surface preparation and coating application was documented by a third-party qualified coating inspector.